Clean Room Construction

Clean Room Construction

Construction of clean rooms for hi-tech and industrial applications.

About This Service

D. Gantz Projects specializes in building clean rooms for the hi-tech, pharmaceutical, food and electronics industries. A clean room is a controlled environment where air particle levels, temperature and humidity are maintained at defined values according to ISO standards.

We build clean rooms at various levels - from ISO 8 to ISO 5 - according to process requirements. Construction includes all required components: modular walls and ceilings, anti-static floors, air filtration systems (HEPA/ULPA), temperature and humidity control, and continuous monitoring systems.

Our experience working with hi-tech and pharmaceutical companies teaches us how critical attention to every detail is. We work in full coordination with clean room consultants and ensure the final result meets all required standards.

With 25+ years of experience and contractor license #27673, we provide end-to-end service: from initial consultation, through design and execution, to room certification according to ISO standards.

Why Choose Us?

ISO Standards
Construction according to ISO 14644 at all cleanliness levels
Advanced Filtration
HEPA and ULPA systems for particle filtration
Environment Control
Precise control of temperature, humidity and pressure
Continuous Monitoring
Automatic monitoring and documentation systems

What's Included

  • Modular walls and ceilings
  • Anti-static floors
  • HEPA/ULPA filtration systems
  • Temperature and humidity control
  • Air locks and gowning rooms
  • Monitoring and documentation systems

Frequently Asked Questions

What is a clean room ISO level?
ISO 14644 standard defines cleanliness levels from ISO 1 (cleanest) to ISO 9. Semiconductor manufacturing requires ISO 5-6, pharmaceutical requires ISO 7-8, and general food and electronics requires ISO 8. We'll advise you on the appropriate level for your process.
How much does it cost to build a clean room?
Clean room construction cost depends on ISO level, room size and system complexity. An ISO 8 room costs $2,000-3,000 per sqm, ISO 7 costs $3,000-4,500 per sqm, and higher levels cost accordingly.
How long does clean room construction take?
Clean room construction (30-100 sqm) typically takes 8-16 weeks, depending on ISO level and system complexity. Larger rooms or higher levels can take 4-6 months.

Interested in this service?

Contact us for a free quote

Get a Quote